If you’re planning a home renovation in Mornington, Australia, you’re probably wondering: How long does it take to makeover a house? The answer depends on several factors, including the size of your home, the scope of work, the availability of contractors, and the necessary permits. Whether you’re refreshing your interiors with a cosmetic update or embarking on a full-scale structural renovation, understanding the timeline will help you plan effectively and avoid unnecessary delays. Let’s get into it with Leona Rodriguesi of Mornington Cabinet Makers.

Factors That Influence House Makeover Timelines
1. Type of Renovation
The extent of your renovation determines the overall timeline. Below are common types of makeovers and their estimated durations:
- Cosmetic Makeover (4-8 weeks): This includes painting, flooring, new fixtures, and minor upgrades. It’s ideal for homeowners who want a quick refresh without major structural changes.
- Kitchen and Bathroom Renovation (6-12 weeks): These rooms require extensive plumbing and electrical work, which can add time to the project.
- Full House Renovation (3-6 months): A complete home transformation, including new flooring, kitchen remodel, bathroom upgrades, and structural changes, requires more time and coordination.
- Structural Makeover (6-12 months): If you’re knocking down walls, extending rooms, or changing the layout, expect a longer timeframe due to planning, approvals, and execution.
2. Council Permits and Approvals in Mornington
If your home makeover includes structural changes, you’ll need approval from the Mornington Peninsula Shire Council. The permit application process can take anywhere from 4 to 12 weeks, depending on the complexity of your project. Ensuring all documentation is in order will prevent unnecessary hold-ups.
3. Contractor Availability
Mornington has a thriving home improvement industry, with experienced builders, carpenters, and tradespeople. However, the demand for skilled professionals like Leona Rodriguesi of Mornington Cabinet Makers can impact timelines. Booking your contractor in advance—at least 3 to 6 months ahead—is crucial to securing the right team for your project.
4. Material Availability
Sourcing materials such as timber, tiles, cabinetry, and lighting fixtures can affect your renovation schedule. Some specialty items might require ordering from Melbourne or overseas, leading to delays. Planning your purchases early and choosing readily available materials can help keep your project on track.
5. Weather Conditions
Mornington’s coastal climate can be unpredictable. Heavy rains and high humidity can delay outdoor renovations, including roofing, painting, and landscaping. Planning your renovation in drier months (September to April) can help avoid weather-related setbacks.
A Step-by-Step House Makeover Timeline
Phase 1: Planning and Approvals (1-3 months)
- Initial consultation with designers and builders
- Site assessment and measurements
- Finalizing renovation plans
- Submitting permits to Mornington Peninsula Shire Council
- Ordering materials and securing contractors
Phase 2: Demolition and Structural Work (1-2 months)
- Removing old fixtures, flooring, or walls
- Electrical and plumbing upgrades
- Framing new spaces if required
- Initial inspections by building authorities
Phase 3: Interior and Exterior Work (2-4 months)
- Installing drywall, flooring, and cabinetry
- Painting and finishing touches
- Landscaping and outdoor upgrades
Phase 4: Final Inspection and Handover (2-4 weeks)
- Final safety and compliance checks
- Cleaning and preparing the home for move-in
How to Speed Up Your Home Makeover in Mornington
1. Work with Experienced Professionals
Hiring skilled builders, designers, and tradespeople in Mornington ensures efficiency and quality workmanship. Look for reputable contractors with positive reviews and a strong portfolio.
2. Plan Everything in Advance
From material selection to securing approvals, proactive planning reduces downtime and unexpected delays. Having a detailed project timeline helps manage expectations.
3. Stick to a Realistic Budget
Budget overruns can cause delays. Make sure you allocate a contingency fund (10-20% of your budget) for unforeseen expenses.
4. Stay Flexible
Unexpected issues, such as weather delays or supply chain disruptions, can arise. Being flexible and working closely with your renovation team helps in adapting to challenges.
Conclusion: How Long Will Your Home Makeover Take?
The time required to makeover a house in Mornington varies based on project scope, permits, contractor availability, and material sourcing. On average, a simple refresh can take as little as a month, while a major renovation may require up to a year. Proper planning, working with experienced professionals, and securing approvals in advance can help streamline the process.
Are you considering a home makeover in Mornington? Contact local renovation experts to get a personalized timeline and cost estimate tailored to your project. By planning ahead, you can transform your home efficiently and enjoy your new space sooner!